Chesnut Lodge Update
This project is of a timber frame construction. On the 27th of September an air permeability test was carried out on the property which passed with flying colours. The design air permeability was specified as 8.Om3/h/m2 and the achieved value was 4.4m3/h/m2, an almost 50 % improvement on the specification. The fantastic results were achieved by the skill and meticulous attention to detail of our staff.
The scaffolding to the rear of the property remains in place whilst we await delivery of the bespoke glass handrails to complete the balcony.