Construction of Chesnut Lodge was completed in December 2010. A very modern. contemporary home with a strong “Eco” presence. The construction was of a twin panel timber frame design. The property was designed to achieve an Air Permeability Test result of 8. Upon testing the building passed with flying colours achieving 4.
The construction also incorporated large glass panels, balconies and extremely large glass doors.